TeraWulf Starts Nuclear-Powered Bitcoin Mining With Nearly 8,000 Rigs at Nautilus Facility

The miner expects its power cost to drop to $0.02/kWh when the nuclear site is fully operational.

Don't got time to read? Listen it & multi task
The miner expects its power cost to drop to $0.02/kWh when the nuclear site is fully operational.

Latest articles by Glenn Nasta

PEGA Pool is the Powered By Sponsor for Mining Disrupt 2023, Supporting Greener Future for Bitcoin Mining
Codego Crypto Gift Cards
Codego Launches the New Era of Crypto Gift Cards
HJHRE Reports HJH Investments’ First Quarter 2023 Results
Introducing DexCheck: The Future of AI-Enhanced Analytics in Crypto and NFT Markets
Introducing DexCheck: The Future of AI-Enhanced Analytics in Crypto and NFT Markets
Translate »